Attached is the schedule of our Pre-arranged Power Interruptions for June 27 to July 3, 2016. This serves as a general information guide and should not be directly construed as an interruption advisory to the e-mail recipients.

Please call us at telephone numbers 16211 or 631-1111 for verification of power interruption schedule.

If you wish to unsubscribe, please send us an e-mail and type in the word "Unsubscribe".

Thank you very much. 




MAINTENANCE SCHEDULE

     To carry out necessary maintenance and upgrading works on various MERALCO distribution facilities, electric service will be temporarily interrupted on the following dates and places:


MONDAY, JUNE 27, 2016
QUEZON PROVINCE (LUCENA CITY; AND TAYABAS)
    BETWEEN 10:00AM AND 2:00PM – PORTION OF CIRCUIT TAYABAS 51ZY
    Portion of Lucena Diversion Road from St. Anne College of Lucena to including University Village Phases 1, 2, 4, 4A & 5, PNB Homes – University Site Subd., Grand Alliance Compound; Manuel S. Enverga University Compound, Lucena Grand Terminal, PHILHEALTH Regional Office 4A, Total Gas Station, Grand Riviera Hotel, St. Paul Farm, Orchids World International, Liberty Broadcasting Network Transmission Tower and Quezon CATV Office in Bgys. Ibabang Dupay and Ilayang Dupay in Lucena City.
    Bgy. Pandakaki in Tayabas.
         
    REASON:     Replacement of pole and primary facilities; and installation of additional lightning protection devices along Lucena Diversion Road in Bgy. Ibabang Dupay and Kaunlaran Mayao in Lucena City, Quezon Province.

MONDAY TO TUESDAY, JUNE 27 – 28, 2016
VALENZUELA CITY
    BETWEEN 11:00PM (MON., 06/27/16) AND 4:00AM (TUE., 06/28/16) – PORTION OF CIRCUIT BAGBAGUIN 422YZ
    Portion of North Luzon Expressway East Service Road from Express Auto Care to near Paso De Blas Road in Bgy. Paso De Blas.

    REASON:     Relocation of pole and line reconductoring works along North Luzon Expressway East Service Road in Bgy. Paso De Blas, Valenzuela City.

*PASAY CITY; AND PARAÑAQUE CITY
    BETWEEN 11:30PM AND 11:59PM (MON., 06/27/16) AND THEN BETWEEN 4:00AM AND 4:30AM (TUE., 06/28/16) – PORTION OF CIRCUIT CBP1A 415RF
    S & R Shopping along Bradco Ave. in Central Business Park, Pasay City.
    Portion of Pres. M. Roxas Blvd. from Crowne Bay Tower to T. Alonzo St. including Chateau De Baie in Baclaran, Parañaque City.
    Portion of F. Redemptorist Road from Pres. M. Roxas Blvd. to F. B. Harrison St. including Aguarra, Bayanihan and G. Cruz Sts.; Max's Restaurant, Jollibee, Chowking, McDonald's, FPC Bldg. and Berma Management Corp. in Baclaran, Parañaque City.
    Portion of E. G. Cruz St. from Aguarra St. to T. Claudio St. including Airport, Correa, Dr. J. Gabriel, L. Gabriel, Lt. Garcia, Mactan and Unida Sts.; Brainshire Science School and Liberty Island Entertainment Club in Baclaran, Parañaque City.

    BETWEEN 11:30PM (MON., 06/27/16) AND 4:30AM (TUE., 06/28/16) – PORTION OF CIRCUIT CBP1A 415RF
    Portion of Coral Way St. from Diosdado Macapagal Ave. to Jose W. Diokno Blvd. including Golden Bay Seafood Restaurant, K-Line Training Center, Fly Ace Corporate Center and A Place in Central Business Park, Pasay City.
    Portion of Sunrise Drive from Coral Way St. to and including SM Corporate Offices A to F, Sea Residences and Oceanaire in Central Business Park, Pasay City.
    Portion of Epifanio Delos Santos Ave. (EDSA) from W. Diokno Blvd. to and including Metrobank, Pasay City.

    REASON:     Line reconstruction works along Coral Way St. in Central Business Park Island, Pasay City.

TUESDAY, JUNE 28, 2016
MALABON CITY
    BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT MALABON 414YD
    Portion of Celia 1 St. from Gen. Luna St. to Dampalit River including Celia II in Bgys. Bayan-Bayanan and Baritan.

    REASON:     Various maintenance works along Celia I St. in Bgy. Bayan-Bayanan, Malabon City.

*QUEZON CITY
    BETWEEN 9:00AM AND 9:30AM AND THEN BETWEEN 4:30PM AND 5:00PM – PORTION OF CIRCUIT STA. MESA 401F
    Portion of Del Monte Ave. from near Banawe Ave. to West Riverside St. including Talayan Village; Philadelphia School, Jollibee and Ace Water Health Spa; Sto. Domingo Ave., Don Jose, Bingo, Cetacio, Cresta, Tabayoc, Palali and Hon. G. Roxas Sts. in Bgy. Talayan, Del Monte, Sienna and Manresa.
    Portion of G. Araneta Ave. from Del Monte Ave. to near Talayan Road including Maria Clara, Tirad Pass, Atok, Macopa, Don Jose, Calamba, Don Ramon, Talayan, Malambo, Simbal, Catmon, Samat Sts. and N. S. Amoranto Ave. in Bgys. Sto. Domingo and Talayan.

    BETWEEN 9:00AM AND 5:00PM – PORTION OF CIRCUITS STA. MESA 401F AND 58F
    Portion of Corumi St. from Del Monte Ave. to and including Agnas, G. Roxas, Malasimbo, Malac, Payte, Masola, Bahawan, Amaloy and Gabo Sts. in Bgy. Masambong.
    Portion of Del Monte Ave. from West Riverside St. to and including Roosevelt Ave., San Pedro Bautista, Tolentino, and Gen. Wood Sts. in Bgy. Paraiso, Del Monte and Damayan.
    Portion of Roosevelt Ave. from near Quezon Ave. to and including Morato Ave., F. Bautista, Subic and Caragay Sts. in Bgy. Damayan.
    Portion of Gen. Lim St. from Quezon Ave. to and including Gen. Segundo, Jose Abad Santos, Gen. De Jesus, Cor. Martelino and Gov. Ablan Sts. in Bgy. Sta. Cruz.

    REASON:     Replacement of rotten poles and other maintenance works along Roosevelt Ave., F. Bautista, Gen. Lim, West Riverside and Corumi Sts. in Bgys. Sta. Cruz, Paraiso, Damayan, Del Monte and Masambong in Quezon City.

WEDNESDAY, JUNE 29, 2016
CALOOCAN CITY
    BETWEEN 9:00AM AND 1:00PM – PORTION OF CIRCUIT GRACE PARK 425RD
    Portion of P. Zamora St. from near A. Mabini Ave. to and including Don Antonio and Doña Consuelo Sts.; Caloocan Evangelical Church, Martinez Memorial College, Caloocan Evangelical School and Don Antonio Chapel in Bgy. Poblacion.

    REASON:     Line reconductoring works along P. Zamora, Don Antonio and Doña Consuelo Sts. in Bgy. Poblacion, Caloocan City.

WEDNESDAY TO THURSDAY, JUNE 29 – 30, 2016
SAN JUAN CITY
    BETWEEN 11:30PM (WED., 06/29/16) AND 4:30AM (THU., 06/30/16) – PORTION OF CIRCUIT VALENCIA 412VAL
    Portion of Barcelona and G. Arellano Sts. from Mariano Marcos St. in Bgy. Maytunas to near Hoover St. in Bgy. Addition Hills.
             
    REASON:     Replacement of rotten poles and line reconstruction works along Barcelona St. in Bgy. Maytunas, San Juan City.

THURSDAY, JUNE 30, 2016
QUEZON PROVINCE (LUCENA CITY; AND PAGBILAO)
    BETWEEN 10:00AM AND 2:00PM – PORTION OF CIRCUIT TAYABAS 51ZY
    Portion of Lucena Diversion Road from Maharlika Highway in Bgy. Talipan, Pagbilao to Metropolis Lucena Subd. including Purok Baybayin, Metropolis East Grove Subd.; Lucena Unifarm, Ouan's Worth Farm and Resort and Quezon Poultry & Livestock in Bgys. Ibabang Dupay, Ilayang Dupay, Mayao Kanluran and Mayao Silangan in Lucena City; New Talipan Rice Mill in Bgy. Talipan, Pagbilao.
         
    REASON:     Replacement of pole and primary facilities; and installation of additional lightning protection devices along Lucena Diversion Road in Bgy. Talipan, Pagbilao and Bgy. Mayao Kanluran, Lucena City in Quezon Province.

SUNDAY, JULY 3, 2016
RIZAL PROVINCE
    BETWEEN 1:00AM AND 2:00AM AND THEN BETWEEN 7:00AM AND 8:00AM – PORTION OF CIRCUIT MASINAG 46WN
    Portion of Marcos Highway from near Wrigley's Compound to and including Palo Alto Executive Village and Foremost Farms in Bgys. Pinugay, San Jose and San Salvador, Baras; Kingsville Heights Subd., Sirbahna Subd. and Tanza Leyva Subd.; Sitios Inuman, Abuyod, Boso-boso, Cabading, Calumpang, Kapatagan, Kaysakat, Pantay, Rizza, Sumilang, Tanza, Tibagan, Sapinit, Painuman in Bgys. Inarawan, Calawis, San Isidro, San Jose, San Juan and San Luis, Antipolo City.
    Along M. L. Quezon St. (Pinugay Road) from Marcos Highway to Roman Rojas Road including Heroes Ville 2 Subd., Colorado Heights Subd. and Ynares Village; Sitios Paenan, Peterson and San Roque in Bgy. Pinugay, Baras.
    Portion of Roman Rojas Road from Foremost Farms in Bgy. Pinugay Baras to and including Sitio Abuyod and Regina Village in Bgy. May-iba, Teresa; and Bgy. Lagundi in Morong.

    BETWEEN 2:00AM AND 7:00AM – PORTION OF CIRCUITS MASINAG 43WN AND 46WN
    Portion of Marcos Highway from Sumulong Highway to near Petron Gas Station in Bgy. Nayong Nayon, Antipolo City including PAGRAI Subd., Lumang Bayan Subd., Esguerra Compound, Siruna Village, Louis Ville Subd.,  Palmera Woodlands Subd., Peñafrancia Subd., Forest Hills Subd., Virginia Summerville Subd., Bentley Park Subd., Villa Leyva Subd., Carolina Village, Antipolo Highlands Subd., Blue Mountains Subd. and Cogeo Village; Sitios Kamias, Taguisan, Cacalog, East Kamias, Gumamela, Ruhat, Manalite, Ma. Corazon and Puting Bato; Rublou Marketplace, Super  Store, CMVC Store, Cogeo Commercial Bldg., Mercury Drug and Gateway Institute of Science and Technology  in Bgys. Mayamot, Mambugan, Sta. Cruz, Cupang, InarawanSan Luis and Bagong Nayon, Antipolo City.

    REASON:     Line reconstruction works inside Meralco – Masinag substation.



MERALCO exerts all efforts to restore electric service as scheduled. However, there are instances when due to unavoidable circumstances, restoration may extend beyond the published schedule.
For more information, please contact our CALL CENTER at telephone no. 16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries, please use the Account Number or Service Identification Number (SIN) indicated in your electric bills.
For those who prefer to receive this schedule via e-mail, simply write to us atcallcenter.tech.assist@meralco.com.ph and type in the phrase "Request for weekly schedule".

VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph



*Additional PPI

Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative.  If erroneously sent or received, please do not open and delete the same from your system.  Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.