Attached is the schedule of our Pre-arranged Power Interruptions (PPI) for September 19 to 25, 2016.  This serves as a general information guide and should not be directly construed as an interruption advisory to the e-mail recipients.

Please call us at telephone numbers 16211 or 631-1111 for verification of power interruption schedule.

If you wish to unsubscribe, please send us an e-mail and type in the word "Unsubscribe".

Thank you very much.




MAINTENANCE SCHEDULE

    To carry out necessary maintenance and upgrading works on various MERALCO distribution facilities, electric service will be temporarily interrupted on the following dates and places:


TUESDAY TO WEDNESDAY, SEPTEMBER 20 – 21, 2016
MAKATI CITY
    BETWEEN 11:00PM (TUE., 09/20/16) AND 4:00AM (WED., 09/21/16) – PORTION OF CIRCUIT KAMAGONG 49VK
    PJL Corporate Center along N. Garcia St. in Santiago Village, Bgy. Valenzuela.

    REASON: Line re-conductoring works along Kalayaan Ave. in Bgy. Valenzuela, Makati City.

CAVITE (CAVITE CITY; AND NOVELETA)
    BETWEEN 11:00PM AND 11:59PM (TUE., 09/20/16) AND THEN BETWEEN 4:00AM AND 5:00AM (WED., 09/21/16) – PORTION OF CIRCUIT ROSARIO 43RS
    Portion of Manila – Cavite Road from Daang Bakal Road in Bgy San Rafael III, Noveleta to and including the whole of Cavite City; Bgys. San Juan I and San Rafael I – IV in Noveleta.

    REASON: Preventive maintenance and testing works in NGCP – Rosario substation.

THURSDAY, SEPTEMBER 22, 2016
QUEZON PROVINCE (MAUBAN)
    BETWEEN 10:00AM AND 3:00PM – PORTION OF CIRCUIT NEW MAUBAN 41WY
    Bgys. Luya - luya and San Gabriel.

    REASON: Line reconductoring works in Bgys. Luya - luya and San Gabriel, Mauban, Quezon Province.

THURSDAY TO FRIDAY, SEPTEMBER 22 - 23, 2016
TAGUIG CITY
    BETWEEN 11:00PM (THU., 09/22/16) AND 4:00AM (FRI., 09/23/16) – PORTION OF CIRCUIT TAGUIG 46ZL
    Portion of Pulong Kendy St. from Liwayway St. to and including Pulong Kendy I & II in Bgy. Sta. Ana.

    REASON: Relocation of pole and line reconductoring works along Pulong Kendy St. in Bgy. Sta. Ana, Taguig City.

SATURDAY, SEPTEMBER 24, 2016
MAKATI CITY
    BETWEEN 10:00AM AND 3:00PM – PORTION OF CIRCUIT NEW ROCKWELL 415VV/416VV
    Trafalgar Plaza Condominium along H. V. Dela Costa St. in Salcedo Village, Bgy. Bel-Air.

    REASON: Replacement of rotten pole and relocation primary line along H. V. Dela Costa St. in Salcedo Village, Bgy. Bel-Air, Makati City.



    MERALCO exerts all efforts to restore electric service as scheduled. However, there are instances when due to unavoidable circumstances, restoration may extend beyond the published schedule. 

    For more information, please contact our CALL CENTER at telephone no. 16211 / 631-1111, fax no. 1622-8554 / 632-8554, or e-mail address callcenter.tech.assist@meralco.com.ph. For faster resolution of inquiries, please use the Bill ID Number or Service Identification Number (SIN) indicated in your electric bills. 

    For those who prefer to receive this schedule via e-mail, simply write to us at callcenter.tech.assist@meralco.com.ph and type in the phrase "Request for weekly schedule".



VIEW YOUR BILL ON LINE. VISIT OUR WEBSITE!
www.meralco.com.ph

Privileged/Confidential information contained in this e-mail and its attachment/s is intended solely for the use of the addressee and is not meant for reproduction, disclosure and distribution to others without previous authorization from Meralco or its authorized representative.  If erroneously sent or received, please do not open and delete the same from your system.  Unless, otherwise specifically stated and confirmed by the authorized representative of Meralco, the opinions and views that may be contained therein are personal to the sender.